With the roof and windows being installed it became safe to begin the rough in plumbing and electric as well as our hvac.
|
basement rough in |
|
kids bath vanity rough in |
|
master bath shower |
|
kitchen sink rough in |
Geothermal-
Our geothermal coils were started last week... started... then the drilling rig broke down and sat on the site for a week before being fixed and finishing up. The pipes are vertical and go 150 feet down into the ground. They are to the right of the "driveway", which wasn't my ideal place, but hopefully the best place for the system.
No comments:
Post a Comment